Acceptance Package Checklist
Affidavit for LLC
Affidavit of No Lien for a Company
Affidavit of No Lien for a Corporation
Application for Permit (Wastewater)
Application for Permit (Water)
Asset Lists – Fiber-Reuse
Asset Lists – Water-Wastewater
Backflow Certification Report
Bill of Sale
Contact Information Update
Contractors Affidavit and Release of Lien
Contractors Responsibilities
Data Sheet for Permit Applications
Density Test Report
Easement Preparation Instructions
Easements
Engineer of Records Responsibilities
FDEP Application for Permit (Wastewater)
FDEP Application for Permit (Water)
FDEP Completion Certification (Wastewater)
FDEP Completion Certification (Water)
Fire Hydrant Repair Kit List
Fixture Unit Calculations
Florida Department of Transportation Utility Permit
Grease Management Plan
Guideline for Estimating Project Fees
Historical Use Flow Calculations
Joinder Consent of Mortgage
Leak Testing Checklist
Material and Installation Warranty
North St. Lucie River Water Control District Permit Application
Owners Affidavit
Owners Responsibilities
Partial Certification Policy
Plat Dedication Language
Port St. Lucie Engineering Excavation Permit
Pre-Construction Meeting Agenda
Pre-Construction Meeting Request
Pressure Test Policy
Product Evaluation Application
Property Owners Affidavit
PSLUSD Fees
PSLUSD Standard Details in DWG Format Application
PSLUSD Water Cert of Construction Completion
PSLUSD Wastewater Cert of Construction Completion
Pump Station Inspection Report
Pump Station Record Information
Pump Station Start Up Policy
Pump Station Start Up Report
Pump Station Start Up Checklist
Repair Kit Photographs
Sample Density Log
Shop Drawings Submittal Instructions
Shop Drawings Transmittal
St. Lucie County Right of Way Permit
Temporary Access and Construction Easement
Utility Project Information
Utility Service Information Application
Utility Standards Manual (2019)
Utility Work Completion Inspection Checklist
Utility Work Completion Report
Wire Continuity Electronic Marker