Plan Approval

This Process Flow Chart will outline the steps of the plan approval process.

Application

Most new projects will use the Application for Approval Utility Project Information for service.

Any food-related business, including certain employee kitchens will require a Grease Management Plan reviewed and approved by PSLUSD staff.

Related documents:

Design

All design and construction shall comply with the Utility Standards Manual, Fiber Protocols, and Standard Details.

Shop drawings are required for all custom-made and some standard items per standards and any items not in the Qualified Products List (QPL).

Related documents:

PSLUSD has state-approved permitting authority for most water and wastewater mains 12" and less in diameter and any associated pumping stations.

PSLUS permitting-related documents:

Florida Department of Environmental Protection (FDEP) permitting-related documents:

Other permitting-related documents: